1. Achieve the technology for the construction and operation of the F-Class plant until 2020.
  2. Achieve the technology for the construction and operation of a Class H power plant by the year 2023.
  3. Achieve production and sales of electricity with a maximum efficiency of up to 80% of the rated capacity of the power plant (total class F and H) until 2026.